Remodeled bathroom with a geometric tile floor and marble vanity

Bathroom Remodels
In Lincoln, Nebraska

Full bathroom remodels, from demolition to final grout.

The best time to call is before the plans are final. Luke wants to see drain locations, niches and framing while they can still move, because a niche cut into a finished wall can land on a vent pipe or an electrical box.

From there the crew runs the whole room, and a licensed plumber we coordinate handles the valves, drains and fixtures. Most bathrooms take two to three weeks from demolition to final grout.

  • Full Bathroom Builds
  • Custom Showers And Tub Surrounds
  • Tile Floors And Feature Walls
  • Curbless Entries, Benches, Niches

Four Stages,
Run In The Same Order

  1. Walkthrough and written scope

    Luke measures the room, checks the substrate and looks at what has to come out. You get an itemized quote and a written schedule before anything is torn out.

  2. Demolition and rough-in

    The old room comes out, the framing and subfloor get checked, and a licensed plumber moves valves, drains and supply lines where the new layout needs them.

  3. Waterproofing and tile

    The pan is sloped a quarter inch per foot to the drain and a bonded membrane runs up the walls above the shower head. Then the tile goes down to a layout dry-laid and centered on the room.

  4. Grout, fixtures and walk

    Grout is floated, cleaned and sealed, edges get 100% silicone caulk, and the plumber sets the fixtures. You give us the green light before the crew packs up.

The Rest Of What We Set

Common Questions

Dot mosaic tile bathroom wall

A Walkthrough First,
Then A Written Scope

Send the room, the tile you like, and a timeline. We will take it from there.