The Pershing Mural mid-installation on a new wall

Work Measured
In Pieces, Not Feet

Custom mosaic work, proven on Nebraska’s largest tile restoration.

Superboy joined the Pershing Mural project in 2025 and spent a few months organizing the tile and producing final mosaic sheets ready for install. The crew reinstalled 763,000 tiles at Wyuka Park from April through July 2026, preserving the original orientation.

A job at that scale is not about speed. It is about a map, a rhythm, and checking alignment every few feet so drift never gets a chance to build. The same patience goes into a fireplace surround, a mosaic niche, or a one-off piece a designer created.

  • Custom Mosaics
  • Historic Restoration
  • Commercial Projects

Four Stages,
Run In The Same Order

  1. Document before anything moves

    Every tile is documented and logged against the drawings and photographs, so the work can be reinstalled in its original orientation.

  2. Clean and assess

    Decades of weather come off the glaze, damaged pieces are identified, and we agree on what gets saved, matched, or remade before setting begins.

  3. Organize

    Pieces are laid out and combed through to ensure accurate orientation.

  4. Install and protect

    Tile is laid with strict adherence to laser levels. Expansion joints are installed to allow for movement. Final product is grouted and protected from the elements to ensure a long, low maintenance life.

The Rest Of What We Set

Teal stacked-tile vanity wall

A Walkthrough First,
Then A Written Scope

Send the room, the tile you like, and a timeline. We will take it from there.

Start a project