
Work Measured
In Pieces, Not Feet
Custom mosaic work, proven on Nebraska’s largest tile restoration.
In 2026 this crew catalogued, cleaned, and reset the Pershing Mural at Wyuka Park: 763,000 tiles moved off a condemned downtown wall and set again without losing the original registration.
A job at that scale is not about speed. It is about a map, a rhythm, and checking alignment every few feet so drift never gets a chance to build. The same patience goes into a fireplace surround, a mosaic niche, or a one-off piece a designer drew.
- Custom Mosaics
- Historic Restoration
- Commercial Projects
Four Stages,
Run In The Same Order
Document before anything moves
Every panel or section is photographed, numbered, and logged against the drawings, so what comes off the wall can go back exactly as it was.
Clean and assess
Decades of weather come off the glaze, damaged pieces are identified, and we agree on what gets saved, matched, or remade before setting begins.
Set to the map
Pieces go back in the order the map dictates, with alignment checked continuously across the wall rather than at the end.
Point and protect
Joints are pointed to match the original, then the finished work is cleaned and protected for however long the site stays active.
The Rest Of What We Set

A Walkthrough First,
Then A Written Scope
Send the room, the tile you like, and a timeline. We will take it from there.
Start a project
